Sienna Resources Inc. is pleased to announce that the Company has completed a 3-hole diamond drilling campaign at their 100% owned Case Lake Project, 80km east of Cochrane, Ontario. The drilling programme totalled 1,026 metres. Significant intervals of sulphide mineralisation were intersected, including intercepts with disseminated and semi-massive to massive mineralisation, hosted in strongly sheared, intermediate volcanic successions, with regions of recrystallised gabbro and metasedimentary rocks. A total of 117 core samples were collected and these have been prioritized for processing and shipping to the lab for analysis. Management cautions that until the assay results are reported by the lab, the Company is not certain of what concentration of metals, if any, will be contained in the drill core samples.
“We are pleased that the drilling was completed on time and on budget,” Jason Gigliotti, President of Sienna Resources Inc. stated. “I want to thank all involved for the great work. Based on what we have seen in the core, photos included, we are optimistic about the results from the drilling program and look forward to getting full assays back to determine the next course of action. We expect the results back in 2-6 weeks.”
To find out what else is going on in the mining industry, click here!